EducationalResidentialCommercialProfile

Educational

Central Middle School

CENTRAL MIDDLE SCHOOL
Long Hill, NJ

This 7400 SF school addition comprised of a two-station Gymnasium, Band Room and Media Center. Additional renovations included ADA upgrades, three Science Room renovations and Central Office alterations. Site improvements addressed bus access and increasing parking capabilities.

This project was one of three projects built simultaneously in the district. The others being a 9-classroom and Gymnasium addition at the Millington School and a 5-classroom addition at the Gillette School.

Maugham School

MAUGHAM SCHOOL
Tenafly NJ

This historic school was selectively re-pointed and corroded lintels were replaced. This was one of many projects completed for the Tenafly Board of Education. Other projects included the following:

  • Full Roof Replacements at the High School and Mackay School
  • ADA upgrades at the High School, Middle School that included hardware replacement and Toilet Room renovations.
  • Exterior door replacements at the High School

Park Ridge High School

PARK RIDGE HIGH SCHOOL
Park Ridge NJ

This old 1908 school building had retained the original Chemistry Lab. Paul Tiajoloff, AIA was retained to replace all finishes and fixtures in place but incorporating computer terminals at all stations and increasing storage for equipment and chemicals. Replacement of the HVAC system to provide sufficient air circulation and fume exhaust was an essential part of the program.

Leonia Middle School

LEONIA MIDDLE SCHOOL
Leonia NJ

One of many restoration projects performed by Paul Tiajoloff, AIA this one consisted of replacing existing windows with new double pane insulated windows. The emphasis was to retain as much of the original effect of the old wood ones.

Conceptual New School

Conceptual New School
Carlstadt NJ

This new school was designed for a steeply sloped site in the location of an existing inefficient elementary school. The project was designed to retain the old structure until the new was finished. The design focused on creating a building that was open to the community and environment.

The rendering was prepared by Howard Associates, Sylvania, OH.

Union Elementary

UNION ELEMENTARY SCHOOL
Union NJ

This $2.7 million addition consists of an expanded gymnasium to full size and adding four classrooms, computer lab, science lab, art and Pre-K and Kindergarten classrooms.

ADDITIONAL EDUCATIONAL FACILITY PROJECTS

Paul Tiajoloff, AIA was the project Architect for the following educational projects.

PLANNING AND FEASIBILITY STUDIES

  • Calstadt Feasibility Study, Carlstadt, NJ

Analysis of two elementary schools for use as a middle school with proposals for future renovations.

  • East Rutherford Feasibility Study, East Rutherford, NJ

Analysis of three elementary schools and middle school with proposals for future renovations.

  • Carlstadt District Wide Facility Study, Carlstadt, NJ

Analysis of three different school buildings to determine life cycle and cost to repair. March 1998.

  • Clifton Elementary Schools Boiler Studies, Clifton, NJ

Analysis of Boiler Rooms in four Clifton Elementary Schools.

  • Hardyston Elementary Schools Five Year Plan, Hardyston, NJ

Five year Master plan for the Renovation of the existing Elementary School.

  • Englewood Cliffs Schools Five Year Plan, Englewood Cliffs, NJ

Five year Master plan for the Renovation of the existing Elementary Schools.

  • Becton Regional High School Five Year Plan, East Rutherford, NJ

Five year Master plan for the Renovation of the existing Elementary Schools.

ADDITIONS

  • Hardyston Elementary School Four Room Addition, Hardyston, NJ

Designed free standing Four-Classroom addition to the existing elementary school. Cost of Construction $650,000. 1996

  • Union Township Elementary School Addition, Union Township, NJ

Gymnasium extension and 7-classroom addition to the existing elementary school. Cost $2.1 million completed 1997.

RENOVATIONS

  • Tenafly High and Middle Schools' ADA Compliance , Tenafly, NJ

Renovation of bathrooms for handicap accessibility and door replacement to provide accessibility. Projected cost of construction $200,000. 1998

  • Tenafly High School and Stillman School ADA Compliance , Tenafly, NJ

Door replacement to provide accessibility. Projected cost of construction $75,000. 1998

  • Clifton Public Schools #5 and #8, Clifton, NJ

Construction documents for boiler and pipe replacement and associated HVAC upgrades. 1993

  • East Rutherford McKenzie Elementary School, East Rutherford, NJ

Temporary structural modifications to the modular wing in danger of collapse. 1996.

  • Leonia High School Trailer Relocation, Leonia, NJ

Relocation of existing middle School Trailers to the High School site for permanent use as administrative offices.

  • Leonia Board of Education Offices, Leonia, NJ

Renovation of existing structure for use as the new Board offices for the Board of Education.

ROOF REPLACEMENT and BUILDING RESTORATION/REPAIR

  • Central Middle School, Long Hill, NJ

Roof replacement on 14,000 SF of area with Built-up roofing. Approximate cost of Construction $140,000. 2005.

  • Gillette Elementary School, Long Hill, NJ

Roof replacement on 1200 SF of area with Built-up roofing. Cost of Construction $12,000. 2005

  • Englewood Cliffs North Cliff School, Englewood Cliffs, NJ

Roof replacement on over 20,000 SF of area with Built-up roofing. Cost of Construction $200,000. 2002

  • Englewood Cliffs Upper School, Englewood Cliffs, NJ

Roof replacement on over 60,000 SF of area with Built-up roofing. Cost of Construction $500,000. 2002.

  • Union Twsp. Elementary School, Hampton, NJ

Roof replacement over Front Wing and Kindergarten. 4000 SF 2000

  • Tenafly High School, Tenafly, NJ

Roof replacement on over 120,000 SF of area with Built-up roofing utilizing the state of the art fume recovery system while the school was occupied. Cost of construction $725,000. 1997.

  • Mackay Elementary School, Tenafly, NJ

Slate roof replacement and facade repair. Projected cost of construction is $325,000. 1998

  • Hardyston Elementary School, Hardyston, NJ

Roof replacement for two wings with a combined area in excess of 15,000 SF with EPDM Roofing. 1995.

  • Fair Lawn Middle School, Fair Lawn, NJ

Roof replacement on over 50,000 SF of area with Built-up roofing. Cost of Construction $266,000. 1993.

  • Clifton Public Schools #4 Roof Replacement and Facade Repair, Clifton, NJ

Roof replacement and complete brick repointing on circa 1900 School. Cost of construction $200,000.

EducationalResidentialCommercialProfile